ATLANTIC LIFTS LTD. FREIGHT PLATFORM LIFT SPECIFICATIONS General 1/ Temporary power supply. 2/ Electrical Service - Division 16. Reference Standards 1/ Manufacture platform lift to CAN/CSA-B44-94, CSA/C22.1-1990, CSA W59-1989, local codes and regulations except where specified otherwise. Description of System 1/ Provide Type ______ Hydraulic Freight Platform Lift Model ____________ by Atlantic Lifts Ltd. 905-686-1110. 2/ Platform _____ (inches) clear width x ______ (inches) clear depth. 3/ Rated load _________ lbs. uniformly distributed on platform. 4/ Travel _______(inches) from ___________ to __________. Serving _________ landings. 5/ Speed 30 FPM approximately in "UP" and "DOWN" direction with rated load. 6/ Openings: ____________( Inline or through) 7/ Pit: ________(inches) Welding 1/ To conform to the CSA W59 - 1989 welding code. Shop Drawings 1/ Submit complete shop drawings For all equipment, hoistway and pit construction. 2/ Location and size of the required fused disconnect. Maintenance Data 1/ Provide maintenance manuals c/w separate breakdown of the hydraulic cylinder, hydraulic power pack, hydraulic and electrical schematics. PAGE 1 Power Supply required 1/ Power supply __________. 2/ Lighting supply 120/1/60. Warranty 1/ Provide two year written parts and labour guarantee. Cylinder and plunger 1/ Construct plunger of selected chromed shafting machined true and finished to surface finish of 0.0008 mm roughness height rating or better. 2/ At top of cylinder provide stuffing box and packing gland with seal or self-adjusting packing with external adjustment and which effectively prevents leakage. 3/ Provide safety bulkhead on cylinder to ANSI A17.1-1978. 4/ Install cylinder and plunger plumb. Operate with minimum friction. Electro-Hydraulic System 1/ Provide hydraulic system consisting essentially of hydraulic pump, holeless side mounted synchronized hydraulic cylinder, and piston, pressure relief valve, fluid reservoir, valves, and connections. 2/ Operate pump continuously in "up" direction, "down" travel shall be by gravity. 3/ Include: 1. Stop to prevent piston from leaving. Oil seals, wipers, guide bearings, gaskets, oil connections, and air elimination means. 2. Pump suction-line strainer. 3. Fluid-level gauge with minimum fluid level clearly indicated. 4. Reservoir with drain, filling opening filter & cover, and reservoir vent that will not allow entrance of dust. 5. Safety orifice at cylinder to control oil flow in case of pipe breakage. Control System 1/ Control platform lift by heavy duty, continuous pressure push-button stations. 2/ Push-buttons to be clearly and permanently identified "UP", "DOWN" and "STOP". 3/ Provide accurately controlled stopping in both up and down directions and maintain platform in any position at which it is stopped until direction button is pressed. PAGE2 4/ Provide approved limit switch to limit up travel of platform. Platform 1/ Construct platform of 1/4" steel. 2/ Provide 12GA panel sides ________(inches) high to match door height. Hoistway 1/ Expanded Metal or concrete block fire rated to ________hrs. Finish 1/ Ferrous metal: 1. Clean metal surfaces, treat with phosphate. 2. Apply one coat of primer in accordance with CGSB 1-GP-40M. 3. Apply one coat of alkyd type machine enamel manufacturer's standard colour. 2/ Fasteners: 1. Zinc or cadmium finish. Doors And Frame 1/ Double Swing; _______(inches) x _______(inches) Expanded metal or fire rated to ________hrs hollow metal. Field Quality Control 1/ Perform and meet tests required by authorities having jurisdiction. 2/ Supply instruments and carry out additional specified tests to approval of Engineer. 3/ Submit to Engineer test and approval certificates issued by jurisdictional authorities. 4/ Test stop ring and hydraulic system by operating platform with rated load in up direction against stop ring at rated speed. PAGE 3